Social Responsibility Project

Location: İstanbul Ayazağa Elementary and Middle School
Consultant: HiM (Architecture for All Association)
Material Sponsor: MEF FADA
Design and Construction Team: Büşra Gödek, Serpil Kardaş, Eren Hatice Gedik, Merve Akdoğan, Rümeysa Aksoy, Ece Nakışçı, Berin Erikçi, Ege Manzak, Gamze Sunar, Ramazan Ersin, Kübra Aksoy, Beste Karaduman, Naz Balekoğlu, Buse Çiftlik, Zeynep Akyol, İremsu Sarıoğlu, Eyüp Arıkboğa, Efe Palas, Hüseyin Furkan Senoğlu, Buğçenur Mistaçoğlu, Begüm Acar, Aleyna Vardar, Gülçin Apaydın, Emir Hacısaffet, Jülide Gökçe Ağu, Tanya Davutoğlu, Çağatay Çelik, Süleyman Aras.

The site that we worked on was the Ayazaga Primary school unusable garden area so, the first problem that we need to solve was the area. The space was huge, and users had so many harmful activities in this area. Also, because of the channel between space and the school, the area was disabled.  We did not have enough material and time. We asked the question: How can the solutions that we thought about these. These problems gave design ideas. We decided to construct some elements which will allow the children to create their games. Besides, we wanted to design elements of the game, not a toy for children. With this idea, we made some topographic was for children to create their combinations. We decided to use concrete cubes for creating topographic waves on the surface.  

bottom of page